top of page

MSB meters

Who will put an adequate metering and monitoring system in place for the MSB Office after 1 September 2019? Response: MSB Office will...

MSB meters

Who will put an adequate metering and monitoring system in place for the MSB Office after 1 September 2019? Response: MSB Office will...

MSB tolerance

The MSB Office which will be based at NamPower is allowed a tolerance band of +- 0.5 MW or +- 2.5% office@rdjconsulting.co.za

MSB tolerance

The MSB Office which will be based at NamPower is allowed a tolerance band of +- 0.5 MW or +- 2.5% office@rdjconsulting.co.za

© 2010 - 2020 by RDJ Consulting. Proudly created with Wix.com

bottom of page